Pine Lake Park Slope Restoration Project

Overview

The Vale Parking lot and Pine Lake Park dog meadow are open but the paved roadway may experience temporary closures when equipment is being brought in or out of the work area. The San Francisco Recreation and Parks Department may also close the area to the public on days with sustained high winds. Please visit their website for wind-related closure information.


June 2025

Restoration of the impacted slope is complete. The final stage of work will be to plant new vegetation on the slope and then restore the valley floor where it has been impacted by this work. An area stretching from the dog park westwards toward the lake will be temporarily fenced off while new sod becomes established. 

The dog park remains open. Please avoid the fenced-in area where staging of materials and equipment is taking place. 


Progress Photos:

June 2025

Placement of mats to stabilize soil

Photo of matting material being laid down on the slope

Intallation of irrigation system on slope

Photo of slope with pvc irrigation pipes being laid down

May 2025

Final grading of slope

Photo of slope showing trench with pvc pipe being laid down

Finished slope prior to vegetation restoration

Finished slope prior to installation of irrigation system

April 2025

Contractor's final work on the upper part of the slope 

photo of slope from April 22, 2025

March 2025

Our removal of hazard trees in Pine Lake Park is complete. 

Crane removing tree from slope

Improving drainage on the western end of Pine Lake Park 

ditch being dug at western end of park

Slope restoration continues

photo shows bottom two-thirds of slope now restored

 

February 2025

Retaining wall mid-way up the slope (will not be visible when project is complete)

image of slope showing new soil laid down as well as the retaining wall

Soil compaction

Image of tractor compacting soil on a flattened portion of the new slope

January 2025

Building up the slope

Machine adding material to base of new slope

Progress on the lower end of the slope

view from base of slope showing machinery adding new material

December 2024

Retaining wall construction

Photo shows exposed retaining wall which will later be covered over

Slope protection during atmospheric river rain event 

Photo shows plastic sheeting laid down on slope to prevent erosion

Preparing slope for installation of steel beams 

 

Photo shows machinery drilling holes in slope 

 

Steel beams after installation on slope

 

Photo of steel beams after installation on slope

 

Cement poured above retaining wall  

 

Cement poured at retaining wall to reinforce the structure

 

November 2024

Restoration of soil on slope, and materials being prepared for the retaining wall 

Image of restoration work on the slope, showing large machinery in the background and construction materials in the foreground

 

October 2024

Overview of work area and dog park

Overview of work area

Machinery used to remove debris from the soil so that it may be reused

Machines "grubbing" the surface of the slide area

  • Construction Start: March 2024
  • Construction End: September 2025
  • Project Phase: Design